Building 101 – built in 2005. Main functionality: offices, production hall, warehouse, locker rooms, conference rooms, testing laboratories
Building 102- built in 2018 – Expansion of the AE production plant
Building 105 – built in 2005. Main functionality: boiler room, central heating, central heating, generators, appliances, general water storage
Building 107 – built in 2005. Main functionality: gatehouse.
Building 102 – built in 2007. Main functionality: production hall
Building 110 – built in 2011. Main functionality: offices, production hall, warehouse, locker rooms, conference rooms, testing laboratories
Building 115 – built in 2011. Main functionality: boiler room, central heating, central heating, generators, appliances, general water storage
Building 117 – built in 2011. Main functionality: gateway.

Characteristics:

[97.000 mp]

Unfolded area

Designed installations:

  • Sanitary and fire extinguishing systems
  • Heating and ventilation installations
  • Installations in the thermal power plant
  • Outdoor water and sewerage and rainwater installations
  • Outdoor electrical installations