BOSCH AE FACTORY

PROJECT DATA:
Customer: ROBERT BOSCH S.R.L.
Investition: BOSCH  AE FACTORY
Location: Jucu, Cluj County
Duration: 2011-2013

PROJECT CHARACTERISTICS:
BUILDINGS 101, 104, 105
Main functions: offices, production, storage, locker rooms, meeting rooms, testing labs
BUILDING 106
Main functions: water management, reservoir ration
BUILDING 107
Main functions: house gate
BUILDING 108
Main functions: nitrogen tank
BUILDING 109
Main functions: waste storage
BUILDING 110
Main functions: cafeteria

SPECIALIZED WORKS COVERS THE DESIGNING OF:

  • sanitary installation and fire fighting installation
  • exterior networks for water, sewage rainfall water drainage and fire fighting
  • heating ventilation and air conditioning
  • interior electrical installation and weak currents
  • exterior electrical instalation and electric shock protection
  • utility connections
BOSCH  AE FACTORY